2JCP SCOPE OF SUPPLY
Delivery of pressure equipment and vessels to PED 97/23/EC including 3rd party design appraisal, inspections and certification.
Client: Europa Crown Ltd
Project type: BTP
Location: Various
2JCP total weight: approx 850 tons, stainless steel 316L
Finished in: 2016
This project is addition of natural gas liquefaction and export facilities to the existing LNG regasification facility in Hackberry, Louisiana.
2JCP SCOPE OF SUPPLY
Supply of 6 sets filter houses for 7EA gas turbines which drive three compressor trains. Filter houses were equipped with high pressure anti icing system piping.
Client: Clarcor Industrial Air
Project type: BTP
Location: Hackberry, Louisiana, USA
2JCP total weight: approx 850 tons stainless steel 316L
Finished in: February , 2016